A Bergey Excel 10 kW wind turbine was installed in November 2006.  After a problem this was replaced by a  12 kw turbine.

This is a 6.7 metre (22 ft) diameter three-blade upwind turbine.  It is designed to achieve high reliability through rugged construction.

The grid connection can take a limited load so surplus electricity is used to heat domestic hot water.

 

 

From Guisborough Road take B1292 towards Middlesbrough.  Enter gate on right.  

Please drive slowly as children may be playing on the entrance drive.

 Fork right on drive. Cross courtyard from parking area and ring bell at side door.

 

 

 

Additional information

Case study for wind turbine at Great Ayton (PDF, 366kB)

Location

somewhere near
Great Ayton
Middlesbrough
North Yorkshire
TS9 6QQ

View on map

Opening times

16 May 2015
11.00 a.m. - 4.00 p.m.

This event has now finished.

Other finished

Other homes nearby

Part of the Green Open Homes network