A Bergey Excel 10 kW wind turbine was installed in November 2006. After a problem this was replaced by a 12 kw turbine.
This is a 6.7 metre (22 ft) diameter three-blade upwind turbine. It is designed to achieve high reliability through rugged construction.
The grid connection can take a limited load so surplus electricity is used to heat domestic hot water.